Plot SB-05
Development Summary *
Overall | |
---|---|
Plot Area | 7,016 m2 |
Maximum Height (Above +14.25 m ASL) |
+32.0 m |
Designated Program (GFA) | |
---|---|
School (KG) | 5,180 m2 |
School (Cycle 1) | 8,820 m2 |
Total Habitable GFA | 14,000 m2 |
FAR | 2.0 |
Parking Requirements | |
---|---|
Estimated Parking Spaces | 112 |
* Figures subject to revision in accordance with project entitlements and refinement
Massing Controls

-
Red dotted lines represent illustrative roof structure
-
Maximum Height +46.25 m ASL
(+32.0 m above +14.25 m ASL) -
Top of Lower Podium / Upper Street Level +14.25 m ASL
-
Promenade / Lower Street Level +3.0 m ASL
-
Depth as needed to satisfy parking requirements
Plot Context
